Construction of pipe Estacada and Pump Station at Sumgait TES
Project name: Pump Station at Sumgait Thermal Electric Station
Client: Azerenerji ASC
Location: Sumgait, Azerbaijan
Scope of Work:
- Construction of Pump station with pipe overpass in the Caspian see for purposes of the Thermal Electric Station
- Length 750m inside the sea territory, ending with the pump station for pumping of cooling water from the Caspian see.
- Capacity of the pump station: 36 000 m3 per hour
Year: 2019