RECONSTRUCTION OF THE BOTTOM DRAINAGE TRACT OF THE SHAMKIR WATER RESERVOIR
1. The volume of drilling and filling works in the water well is 135,000 m3
2. Water pumping – 57,000 m3
3. Reconstruction of the metal joints of the water crossing profiles in the upper bay - 1600 m2
4. Concrete Injection works using special material mixtures to prevent pressurized water jets on the walls and ceiling of the three-hole bottom pipe along the entire length of the profile - 18000m3
5. Reinforced concrete work for the reconstruction of the entire floor of the water well and the spaces under the retaining walls, starting from the outlet portal of the water-filling tract - 38000m3
6. Restoration of the retaining walls and the side walls of the bottom pipe and the ceiling by shotcrete method - 9000m2
Year: 2019